The biggest challenge in building Grand Coulee Dam was diverting the flow of the Columbia.

04/03/2012 | Rating NR

American Experience

Diverting the Columbia River

Clip: Season 24 Episode 6 | 2m 40s

The biggest challenge in building Grand Coulee Dam was diverting the flow of the Columbia.

The biggest challenge in building Grand Coulee Dam was diverting the flow of the Columbia. To make this happen, the workers had to build cofferdams, temporary structures that keep the river at bay, allowing workers to dig out the mud and expose the granite bedrock on which the dam would rest. The west side cofferdam was completed on March 23, 1935. Soon after, the water level rose 32 feet.

04/03/2012 | Rating NR

Problems playing video?   | Closed Captioning Feedback

Report a Problem

Before you submit an error, please consult our Video Help page.

Problems playing video?   | Closed Captioning Feedback

Report a Problem

Before you submit an error, please consult our Video Help page.

Corporate sponsorship for American Experience is provided by Liberty Mutual Insurance and Carlisle Companies. Major funding by the Alfred P. Sloan Foundation.

Support provided by:

Liberty Mutual InsuranceCarlisle

Grand Coulee Dam - Preview

Preview: S24 Ep6 | 30s | Airs Tuesday, February 18, 2014 at 8/7c. Check your local listings. (30s)

The Columbia Basin Project

Clip: S24 Ep6 | 1m 5s | In the spring of 1952, work was finally underway on the Columbia Basin Project. (1m 5s)

Grand Coulee Dam: Engineering Challenges

Clip: S24 Ep6 | 2m 46s | The engineering challenges became apparent as soon as construction got underway. (2m 46s)

Grand Coulee Dam: Pouring the Concrete

Clip: S24 Ep6 | 1m 56s | It took millions of cubic yards of concrete to build Grand Coulee Dam. (1m 56s)

The Impact of Grand Coulee Dam

Clip: S24 Ep6 | 1m 13s | Grand Coulee Dam was dedicated in front of a crowd of 8,000 on March 22, 1941. (1m 13s)

Grand Coulee Dam Chapter 1

Clip: S24 Ep6 | 13m 16s | Premiering April 3, 2012 at 8/7c. Check your local listings. (13m 16s)

Grand Coulee Dam's Open Spillways

Clip: S24 Ep6 | 15s | This 15-second time-lapse video shows the Grand Coulee Dam's spillway closing. (15s)

Providing Support for PBS.org

Learn Moreabout PBS online sponsorship

Support for PBS provided by:

Corporate sponsorship for American Experience is provided by Liberty Mutual Insurance and Carlisle Companies. Major funding by the Alfred P. Sloan Foundation.

Sign in with Email

or

Continue with GoogleContinue with FacebookContinue with Apple

By creating an account, you acknowledge that PBS may share your information with our member stations and our respective service providers, and that you have read and understand the Privacy Policy and Terms of Use.

Are you sure you want to remove null from My List?